| 洛阳AS9120_AS9120B质量管理体系 航空 航天和防务分销商的要求6.3变更的策划-纵横世纪-2023年 | |
| 发表时间:2021-01-21 阅读次数:432 | |
|
6.3、变更的策划 当组织确定需要对质量管理体系进行变更时,变更应按所策划的方式实施(见 4.4)。 组织应考虑: a)变更目的及其潜在后果; b)质量管理体系的完整性; c)资源的可获得性; d)职责和权限的分配或再分配 6.3、Planning of Changes When the organization determines the need for changes to the quality management system, the changes shall be carried out in a planned manner (see 4.4). The organization shall consider: a. the purpose of the changes and their potential consequences; b. the integrity of the quality management system; c. the availability of resources; d.the allocation or reallocation of responsibilities and authorities.
|
|